  The maintenance of log splitter is extremely important and frequent work. It should be closely coordinated with the extreme operation and maintenance, and there should be full-time staff to conduct on-duty inspections. Sawdust machine, wood sawdust machine, sawdust machine price, sawdust machine equipment, sawdust machine manufacturers

  1. Maintenance of log splitter:

  1. The shaft of the bearing sawdust machine bears the full load of the negative machine, so good lubrication has a great relationship with the life of the bearing, it directly affects the life and operation rate of the machine, so the injected lubricating oil must be clean and the seal must be good, The main oil injection point of this machine (1) rotating bearing (2) roll bearing (3) all gears (4) movable bearing and sliding plane.

  2. The newly installed wheel tires are prone to looseness and must be checked frequently.

  3. Pay attention to whether all parts of the machine work normally.

  4. Pay attention to check the degree of wear of easily worn parts, and pay attention to replacing worn parts at any time.

  5. On the plane of the bottom frame of the movable device, dust, and other objects should be removed to prevent the movable bearing from moving on the bottom frame when the machine encounters unbreakable materials, which may cause serious accidents.

  6. If the bearing oil temperature rises, stop the machine immediately and check the cause to eliminate it.

  7. If there is an impact sound when the rotating gear is running, stop and check it immediately and eliminate it

  2. Wood chip machine installation and test run:

  1. The equipment should be installed on a level concrete foundation and fixed with anchor bolts.

  2. Pay attention to the verticality between the main body and the horizontal when installing

  3. After installation, check whether the bolts at various parts are loose and whether the door of the main engine is fastened. If so, please fasten it.

  4. Configure the power cord and control switch according to the power of the equipment.

  5. After the inspection is completed, a no-load test run is carried out, and the test run is normal and production can be started.